Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

209 unique locations (581 components) - Page 2 of 21

TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (4 components)
• 5 MW of demand reduction (2)
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (2 components)

5 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional DE6
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Trent Basin Nottingham NG2 4DS (2 components)

A 0.5MW Lithium Ion Battery based in Nottingham (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
• 1.200MW Battery Energy Storage System (2)
• 1.200 MW of demand reduction
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Thornham Lane, Emsworth, PO10 8DD (2 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions … (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
These sites are already generating and exporting to the distribution grid. We are aggregating their output in the context of and FFR Growth programme. (2 components)

Different sites with generation increase that already participate in the FFR growth programme

LIMEJUMP LTD Rejected
Inactive • 2016-17 (TR)
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (2 components)

0.9MW Battery storage located at Hampshire (2)

Battery Storage LIMEJUMP LTD Not Prequalified SO5
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 10 locations