FLEXITRICITY LIMITED

21 unique locations (279 components)

Active MW: 1361.10 MW
Inactive MW: 1771.28 MW
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.56 MW
Cairnton Road, Boyndie, Banffshire, AB45 2LR (10 components)
• Standby diesel generator that reduces site load when generating.
• Standby generation
• Standby generation from a POSGU.
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (5 components)
• Load curtailment
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Active • 2023-24 (T-4), 2022-23 (T-3) ...
2.58 MW
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (10 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2023-24 (T-4), 2022-23 (T-3) ...
Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (12 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.38 MW
Deansford Lane, DY10 4NB (13 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
3.56 MW
Dock Yard Rd, Ellesmere Port, CH65 4EG (12 components)
• BtM storage as standby generation, non-exporting
• BtM storage providing standby capacity
• BtM storage/standby generation; non exporting
Active • 2023-24 (T-4), 2022-23 (T-3) ...
2.58 MW
Elphinstone Research Centre, Tranent EH33 2NE (6 components)
• Load drop
• Load drop by on-site generation
Active • 2023-24 (T-4), 2022-23 (T-3) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (10 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2026-27 (T-4), 2023-24 (T-4) ...
3.22 MW
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (39 components)

load curtailment at site

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.07 MW
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Hempstead Lane, Hempstead, Gloucester GL2 5LF (15 components)
• A standby diesel generator on a waste water treatment works.
• A standby diesel generator on a waster water treatment works.
• Standby generation
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.00 MW
Joan Ln, Bamford, Hope Valley S33 0AW (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2027-28 (T-4), 2023-24 (T-4) ...
3.56 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (14 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Manchester Rd, Carrington, Manchester M31 4TG (32 components)

load curtailment at site

Active • 2023-24 (T-4), 2022-23 (T-3) ...
Meerbrook, Leek, Staffordshire, ST13 8SN (6 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (16 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.60 MW
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.56 MW
Saltend Lane, HULL, HU12 8PP (27 components)
• Load reduction
• Load reduction on site
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (12 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (2 components)

Water source Heat Pumps at 1748KW each - located at Horticultural site

Active • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 21 locations