Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

VPI POWER LIMITED

23 unique locations (117 components)

Active MW: 14786.58 MW
Inactive MW: 29612.86 MW
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (9 components)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Livesey Branch Rd. Feniscowles. Blackburn. BB2 5HX (4 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Land west of Basildon substation, Lower Dunton Road, Basildon, Essex, SS16 6EB (1 component)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2021-22 (T-4)
Land off Station lane, Monkton Mains, Wormald Green, Harrogate HG3 3QA (3 components)

10no. twin pack gas generators with 10no. transformers, DNO substation, 33kV switchroom and ancillary requirements

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land off Nobel Road, Wester Gourdie Industrial Estate, Dundee, DD2 4UH (9 components)

Gas fuelled Generating Sets

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land North of Clayhill Farm, Westoning, MK45 5JD (9 components)
• 6.000MW of battery storage located at Westoning.
• 6.000MW of storage located at Westoning
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land adjacent to Haydock Cross Industrial Estate Kilbuck Lane Haydock WA11 9SR (3 components)

Gas engine system capable of exporting electricity.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE (2 components)
• 2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW
• 49.9 MW standalone battery energy storage project.
Active • 2027-28 (T-4), 2025-26 (T-1)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (3 components)
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
• New reciprocating generating plant.
Inactive • 2021-22 (T-4)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (10 components)
• Combined Cycle Gas Turbine plant
• New build Combined Cycle Gas Turbine plant
• New build Open Cycle Gas Turbine plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)

Combined Cycle Gas Turbine plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (11 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (11 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Camphill Road, Byfleet KT14 6EW (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Basin Road South. Portslade. East Sussex. BN41 1WF (6 components)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Basin Road South, Portslade, East Sussex, BN41 1WF (7 components)
• Combined Cycle Gas Turbine plant
• Existing Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 ORF (4 components)
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
• Combined Cycle Gas Turbine
Active • 2024-25 (T-4), 2017-18 (T-1)
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)
• Combined Cycle Gas Turbine
• Water treatment centre
Inactive • 2022-23 (T-3), 2020-21 (T-4)
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 23 locations