Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

VEOLIA UK LIMITED

3 unique locations (48 components)

Active MW: 510.60 MW
Inactive MW: 630.61 MW
Asda Straiton, Bush Estate, Penicuik EH26 0QA (8 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Load reduction on site supported by standby generation
• Standby generation reducing load
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Crossdykes Wind Farm, Langholm, Lockerbie, DG11 2QL (18 components)
• 23.000MW of Wind Generation
• Lithium ion battery storage at a material recycling facility in south east London.
• Wind Turbines to be installed at Crossdykes Wind Farm
Active • 2024-25 (T-4), 2023-24 (T-1) ...
EMR Landor Street , Landor Street, Nechells , B8 1AF (22 components)
• 2*2 gas reciprocating engines with a total gross power capacity of 4.00 MW and a net power capacity of 3.960 MW.
• Component has yet to be procured.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Loading map...
Showing 3 locations