Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

URBAN RESERVE STORAGE LIMITED

22 unique locations (110 components)

Active MW: 281.41 MW
Inactive MW: 193.08 MW
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (2 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2025-26 (T-1), 2024-25 (T-1)
Rassau Industrial Estate, Ebbw Vale, Blaenau Gwent, NP23 5SD (13 components)

Peak power plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-1)
Plot 3a Dukes Drive Kingmoor Park CA6 4SL (10 components)
• Existing power station comprised of multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Ottringham Road Keyingham Hull North Humberside HU12 9RX (12 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (22 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

Active • 2027-28 (T-4)
Midland Road, Bath, BA2 3EW (15 components)

A reciprocating gas engine CHP site providing hot water to a local district heating network.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Middle Balbeggie Solar Farm, Kirkcaldy, Fife, KY1 3NW (4 components)

The CMU consists of an energy storage system, physically co-located at the site of, but distinct from an existing solar PV generator.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Letchworth Power, Dunhams Lane, Letchworth Garden City, SG6 1JH (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

Active • 2027-28 (T-4)
Land West of Staithes Road Hull HU12 8DX (1 component)

The CMU component will comprise containerised gas engines, transformers, a swithgear building, gas kiosk, DNO switch room, communications devices for control of the asset all in a compound secured by …

Inactive • 2020-21 (T-4)
Land South of Anchor Lane, Bilston, WV14 9NA (6 components)
• A new build gas fuelled generating station.
• Gas fuelled generators installed on a compound to the south of Anchor Lane
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Unity Farm, Brampton CA8 1QZ (1 component)

CMU component consisting of multiple battery cells for electricity storage @11kV and the supply of electricity to the 11kV network

Active • 2028-29 (T-4)
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
Land at Dunhams Lane, Letchworth Garden City, SG6 1JH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2025-26 (T-1)
Exeter Road, Ottery St. Mary, EX11 1RB (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Inactive • 2022-23 (T-4)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
• CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (7 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 22 locations