URBAN RESERVE (ASSETCO) LIMITED

16 unique locations (288 components)

Active MW: 180.04 MW
Inactive MW: 294.45 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (44 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (12 components)

District heating implementation with one asset 1MW and no auxiliary load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Cottam Development Centre Power Station Cottam Retford DN22 0TF (9 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (43 components)
• Hartlepool Power Station CMU 1: [HR1-16] T_HRTL-1
• Hartlepool Power Station CMU 1: [HR1-17] T_HRTL-1
• Hartlepool Power Station CMU 1: [HR1-18] T_HRTL-1
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (31 components)
• Heysham 1 Power Station CMU 1: [HY1118] T_HEYM11
• Heysham 1 Power Station CMU 1: [HY1119] T_HEYM11
• Heysham 1 Power Station CMU 1: [HY1120] T_HEYM11
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)
• 1.200MW of battery storage located at Preston.
• 1.200MW of storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD
• Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fowler Welch - Site 3, W Marsh Rd, Spalding PE11 2HR, UK (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (24 components)
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Lunar Freezing - Peterhead, Craigshaw St, Aberdeen AB12 3AE, UK (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (10 components)

A gas engine CHP site providing hot water to an industrial unit

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Pitlochry Power Station, Port Na Craig Road, Pitlochry, Perth and Kinross, PH16 5BF (2 components)

2x Hydro Generating Gensets - Pitlochry

Active • 2028-29 (T-4), 2027-28 (T-4)
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2027-28 (T-4), 2024-25 (T-1)
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...