URBAN RESERVE (ASSETCO) LIMITED

4 unique locations (26 components)

Active MW: 180.04 MW
Inactive MW: 294.45 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (6 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (7 components)
• CMU ID 22GER1, a new build battery storage CMU
• CMU ID 22GER4, a new build battery storage CMU
• CMU ID 23GER1, a new build battery storage CMU
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-1) ...
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (7 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery storage plant on at land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL.. Thurrock Power Limited will be constructed to be a brand new generating asset and is expected to have an equipment design life of 20 years. An experienced Operations & Maintenance contractor will be employed to ensure the plant is running effectively and efficiently to meet Capacity Market requirements. An Independent technical expert will be engaged to confirm the Plant will meet the Extended Years Criteria, Financial Commitment Milestone, and 6 monthly report for the Delivery Body as required under paragraph 8.3.6A of the Capacity Market Rules.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...