Shovel Ready 2 Limited

4 unique locations (12 components)

Active MW: 128.12 MW
Inactive MW: 141.43 MW
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2027-28 (T-4), 2024-25 (T-1)
Loading map...
Showing 4 locations