Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

STOR 104 LTD

5 unique locations (21 components)

Active MW: 4396.88 MW
Inactive MW: 7678.62 MW
Willow Farm Doncaster Road Tadcaster LS24 9PA (3 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Holden Way, Wainwright Street, Dukinfield, Cheshire SK16 5PL (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Flat Lane, Skipton, North Yorkshire, BD23 4RE. (4 components)

Energy facility comprising of reciprocating engine sets.

STOR 104 LTD Not Prequalified BD23
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 5 locations