STATKRAFT UK LTD

5 unique locations (53 components)

Active MW: 385.33 MW
Inactive MW: 171.98 MW
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (5 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2025-26 (T-1), 2028-29 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (6 components)

BESS project to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (3 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
East Tarelgin Farm, Ayr, KA6 6NF (6 components)
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Not Prequalified
Inactive •
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (33 components)
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Cwm Rheidol Power Station (being one out of two) which is supplied by water from the Dinas Reservoir.
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU is situated at the Dinas Power Station, which is supplied by water from the Nant-y-Moch reservoir.
Inactive •