SSE Generation Limited

15 unique locations (505 components)

Active MW: 6861.98 MW
Inactive MW: 10342.73 MW
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)
• 1 x hydro turbine & synchronous generator
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Chichester Food Park, Bognor Rd, Chichester PO20 1NW, United Kingdom (99 components)
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (142 components)
• Genset 2.
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-4 = 100% (T_WBUPS-4) + 25% (E_WBUPS-STX)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Errochty Power Station, Tummel Bridge, Pitlochry, PH16 5NT (27 components)
• Generating Unit 1
• Generating Unit 2
• Generating Unit 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fasnakyle Power Station, Cannich, Beauly, IV4 7NB (10 components)
• Generating Unit 1
• Generating Unit 2
• Generating unit 3.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (16 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• Genset 2.
• This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" status FCC Buckinghamshire Ltd. 300kT Energy from Waste Plant with c. 25MW net output. Auxiliary load is not included in the connection capacity i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (23 components)
• Generating Unit 2
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (Next to Damhead Creek Power Station CMU SP17DC) (6 components)
• 1 x hydro turbine & synchronous generator
• New build Open Cycle Gas Turbine plant
• bus depot
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (45 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (27 components)
• A gas fuelled generating station.
• Generators at hospital site
• Peterhead CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sloy Power Station, Arrochar, G83 7DP (26 components)
• 1 x hydro turbine & synchronous generator
• Genset 2
• Genset 3
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Stagecoach Guildford, Peasmarsh, Guildford, GU3 1LZ (12 components)
• 390kW Battery Storage located at Stagecoach Guildford depot
• Genset 2
• New build battery
Active • 2026-27 (T-4), 2023-24 (T-1) ...
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (19 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• EV charging at residential premises
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
XPO - Spalding, W Marsh Rd, Spalding PE11 2HR, UK (18 components)
• 1 x hydro turbine & synchronous generator
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 15 locations