SMARTESTENERGY LIMITED

139 unique locations (1420 components) - Page 1 of 6

Active MW: 206.44 MW
Inactive MW: 1015.19 MW
XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (11 components)
• Flour & semolina milling business
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
XPO - Spalding, W Marsh Rd, Spalding PE11 2HR, UK (18 components)
• 1 x hydro turbine & synchronous generator
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
XPO - Plymouth, Estover Road, Plymouth, Devon, PL6 7PF (10 components)
• Aggregate CMU from Multiple Sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
XPO - Avonmouth, St AndrewsRoad, Avonmouth, Bristol BS11 9HP (20 components)
• Flour Mill
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (6 components)
• Milling Motor Pelletizers, Fans etc
• New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
• load curtailment at site
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (5 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Flour & semolina milling business
Active • 2024-25 (T-1), 2021-22 (T-4) ...
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (30 components)
• West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
• West Burton B Power Station CMU 3 WB3-24= 100% T_WBURB-3
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Units 13 and 14, Ashmount Business Park, Upper Forest Way, Swansea Enterprise Park, Swansea, SA6 8QR (2 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Aggregate CMU from multiple sources
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Unit E Main Line Industrial Estate Milnthorpe LA7 7LR (4 components)
• Aggregate CMU from multiple sources
• New build gas generator
Inactive • 2022-23 (T-3), 2017-18 (T-1)
UNIT 13A LITTLE OAK DRIVE ANNESLEY NOTTINGHAM, NG15 0DR (3 components)

Anti-corrosion and thermal barrier coatings for aero engine turbine components

Inactive • 2017-18 (TR)
Turweston Road, Brackley NN13 7DD (3 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2018-19 (T-1)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FN (5 components)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in covering letter
• Aggregate CMU from Multiple Sources
• Didcot B5 - CCGT
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FN (3 components)
• CHP engine in a horticultural environment, natural gas, no aux load
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• gas generation
Inactive • 2021-22 (T-4)
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (18 components)
• Aggregate CMU from multiple sources
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2026-27 (T-4), 2022-23 (T-4) ...
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)
• A gas fuelled generating station.
• Existing Energy from Waste Plant
• Poole Existing Site CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
St Johns Town of Dalry, Castle Douglas, Kirkcudbrightshire, DG7 3UB, Scotland (37 components)
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• Kendoon hydro power station - Unit 2, part of the Galloway hydroelectric scheme
Active • 2028-29 (T-4), 2026-27 (T-4) ...
STERTE AVENUE POOLE DORSET, BH15 2AS (3 components)

Manufacturing Chilled Savoury Products

Inactive • 2017-18 (TR)
Station Rd, Cowie, Stirling FK7 7BQ (3 components)
• Aggregate CMU from multiple sources
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Loading map...
Showing 25 locations