RWE GENERATION UK PLC

26 unique locations (1268 components) - Page 1 of 2

Active MW: 6486.12 MW
Inactive MW: 56227.59 MW
AB51 (95 components)
• Domestic demand turn down
• Load curtailment from refridgeration
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AL6 (60 components)
• EV charging at residential premises
• EV charging on residential premises
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B61 (95 components)
• Component has yet to be procured - Unproven DSR
• EV charging at residential premises
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B65 (20 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• EV charging at residential premises
• FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network
Active • 2025-26 (T-1), 2024-25 (T-1) ...
421.87 MW
B73 (67 components)
• A gas engine CHP site providing hot water to a local district heating network
• Domestic demand turn down
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B91 (169 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Energy from Waste Facility located in Grace Road, Exeter.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
68.05 MW
B92 (91 components)
• EV charging at residential premises
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load curtailment from refridgeration
Active • 2025-26 (T-4), 2024-25 (T-1) ...
BA1 (88 components)
• Domestic demand turn down
• EV charging at residential premises
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
61.07 MW
BA2 (149 components)
• EV charging at residential premises (2)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
59.44 MW
BB10 (37 components)
• 40MW battery storage located near to the Coalburn North 400kV substation.
• EV charging at residential premises
• West Burton B Power Station CMU 2 WB2-24= 100% T_WBURB-2
Active • 2027-28 (T-4), 2025-26 (T-1) ...
49.16 MW
BB9 (36 components)
• Didcot B5 - CCGT MSID: 4055
• EV charging at residential premises
• Load drop
Active • 2027-28 (T-4), 2025-26 (T-1) ...
692.39 MW
BD20 (80 components)
• EV charging at residential premises (2)
• domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH24 (75 components)
• Didcot B6 - CCGT MSID: 4055
• Domestic demand turn down
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
653.69 MW
BL2 (51 components)
• Carsfad hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• EV charging at residential premises
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL4 (27 components)
• Domestic demand turn down
• EV charging at residential premises
• Generating unit 3.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BL6 (82 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• EV charging at residential premises
• Load curtailment from refridgeration
Active • 2027-28 (T-4), 2025-26 (T-1) ...
0.27 MW
CHESTNUT AVENUE LONG MARSTON STRATFORD UPON AVON WARWICKSHIRE CV37 (3 components)
• Hydroelectric plant
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.77 MW
COLLERNE STREET ROMFORD ESSEX RM3 (3 components)
• Hydroelectric plant
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
0.40 MW
DENT DALE ACCRINGTON LANCASHIRE BB5 (3 components)
• Hydroelectric run of river power station
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.73 MW
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (20 components)
• Didcot B5 - CCGT
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
HAGGSTONES ROAD OUGHTIBRIDGE SHEFFIELD S35 (3 components)
• Hydroelectric run of river generating plant
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.73 MW
KINGSWOOD FIRS GRAYSHOTT HINDHEAD SURREY GU26 (3 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Hydroelectric Plant
Active • 2028-29 (T-4), 2025-26 (T-1)
2.04 MW
LICHFIELD ROAD WALSALL WOOD WALSALL WEST MIDLANDS WS9 (3 components)
• Hydroelectric plant
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
13.50 MW
MARR WAY NORTH BERWICK EH39 (2 components)
• Domestic EV charger
• Hydroelectric run of river power station
Active • 2028-29 (T-4), 2025-26 (T-1)
2.73 MW
Moor Drive Keighley West Yorkshire BD22 (3 components)
• Hydroelectric plant.
• Load curtailment
Active • 2028-29 (T-4), 2025-26 (T-4) ...
1.74 MW