Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RWE GENERATION UK PLC

180 unique locations (15285 components) - Page 1 of 8

Active MW: 6486.12 MW
Inactive MW: 56227.59 MW
AB32 (45 components)
• EV charging at residential premises (2)
• Domestic EV charger
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AB51 (95 components)
• Domestic demand turn down
• Load curtailment from refridgeration
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
AL6 (60 components)
• EV charging at residential premises
• EV charging on residential premises
• domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B13 (61 components)
• EV charging at residential premises (2)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B49 (36 components)
• EV charging at residential premises
• Gas Turbine Cogeneration Unit GT3
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
B61 (95 components)
• Component has yet to be procured - Unproven DSR
• EV charging at residential premises
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B63 (53 components)
• Bus depot site
• Domestic demand turn down
• EV charging at residential premises
Active • 2025-26 (T-1), 2025-26 (T-4) ...
B65 (20 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• EV charging at residential premises
• FM2 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network
Active • 2025-26 (T-1), 2024-25 (T-1) ...
421.87 MW
B72 (35 components)
• EV charging at residential premises (2)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
36.88 MW
B73 (67 components)
• A gas engine CHP site providing hot water to a local district heating network
• Domestic demand turn down
• EV charging at residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B77 (137 components)
• Domestic demand turn down
• EV charging at residential premises
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
427.50 MW
B78 (64 components)
• EV charging at residential premises (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
B91 (169 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Energy from Waste Facility located in Grace Road, Exeter.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
68.05 MW
B92 (91 components)
• EV charging at residential premises
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Load curtailment from refridgeration
Active • 2025-26 (T-4), 2024-25 (T-1) ...
BA1 (88 components)
• Domestic demand turn down
• EV charging at residential premises
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
61.07 MW
BA2 (149 components)
• EV charging at residential premises (2)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
59.44 MW
BB7 (117 components)
• EV charging at residential premises (2)
• Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 3.557 MW as per the 3 highest export peaks.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
412.96 MW
BB9 (36 components)
• Didcot B5 - CCGT MSID: 4055
• EV charging at residential premises
• Load drop
Active • 2027-28 (T-4), 2025-26 (T-1) ...
692.39 MW
BD10 (35 components)
• Domestic EV charger
• EV charging at residential premises
• EV charging on residential premises
Active • 2027-28 (T-4), 2025-26 (T-1) ...
68.05 MW
BD11 (35 components)
• Domestic demand turn down
• EV charging at residential premises
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BD20 (80 components)
• EV charging at residential premises (2)
• domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH1 (5 components)
• EV charging at residential premises (2)
• Great Yarmouth 1 - CCGT
Active • 2025-26 (T-1), 2025-26 (T-4) ...
BH21 (114 components)
• Domestic demand turn down
• EV charging at residential premises
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD-19? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU i.e. TG1B). Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. Gross 3 HH av. peak generation from Unit 3 on separate days = 32.869 MW At these three HH times, aux load on Unit 3 = -1.468 MW Net generation from Unit 3 = 31.401 MW
Active • 2027-28 (T-4), 2025-26 (T-1) ...
23.80 MW
BH24 (75 components)
• Didcot B6 - CCGT MSID: 4055
• Domestic demand turn down
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
653.69 MW
BL2 (51 components)
• Carsfad hydro power station - Unit 1, part of the Galloway hydroelectric scheme
• EV charging at residential premises
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2025-26 (T-1), 2025-26 (T-4) ...
Loading map...
Showing 25 locations