Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

RNK Holding Ltd

3 unique locations (35 components)

Active MW: 0.00 MW
Inactive MW: 31.91 MW
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (19 components)
• Battery Storage Plant
• Load reduction on site supported by non-exporting standby generation.
• Reciprocating genset in acoustic enclosure
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (7 components)
• New build gas generator
• The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ (9 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export capacity of 40MW.
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 3 locations