Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Peak Power Connections Limited

6 unique locations (46 components)

Active MW: 242.68 MW
Inactive MW: 2019.24 MW
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (8 components)
• Battery Storage Facility
• Diesel and/or gas reciprocating engines.
• Pre-refurbishment generating Unit 1
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Barnfield Road Swindon SN2 2DJ (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Battery Storage Facility
Inactive • 2021-22 (T-4)
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (3 components)

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (15 components)
• Battery Storage facility
• gas reciprocating engines.
• gas-fired CHP unit
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Old Littleton Road, Chertsey, TW17 9NU (4 components)
• Battery Storage Facility
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-1), 2021-22 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 6 locations