Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

PULSE CLEAN ENERGY UK LIMITED

13 unique locations (76 components)

Active MW: 75.07 MW
Inactive MW: 245.19 MW
West Thorpe, Willoughby on the Wolds, LE12 6TD (15 components)
• Additional capacity alongside other plant at Willoughby. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone was been completed before the previous auction.
• Reciprocating engines
Active • 2016-17 (TR), 2017-18 (T-1) ...
West Thorpe, Willoughby-on-the-wold, LE12 6TD (4 components)

New build one-hour duration storage to replace diesel plant

Active • 2023-24 (T-1)
6.79 MW
TIR John North Road, St Thomas, Swansea, SA1 7BG / SA1 8NZ (4 components)

New build one-hour duration storage to replace diesel plant

Active • 2023-24 (T-1)
TIR John North Road, St Thomas, Swansea, SA1 7BG (1 component)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4)
Pengarnddu Ind Est, Dowlais Top CF48 2TA (7 components)

Additional capacity alongside the long term STOR at Dowlais (Merthyr Tydfil). The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to …

Active • 2017-18 (T-1), 2020-21 (T-4)
Main Ave, Hirwaun, CF44 9UY (18 components)
• Additional capacity alongside the long term STOR at Hirwaun & Dowlais. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
• Reciprocating engines
Active • 2016-17 (TR), 2017-18 (T-1) ...
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (4 components)

New build one-hour duration storage to replace diesel plant

Active • 2023-24 (T-1), 2025-26 (T-4)
Great Field Lane, Somerden Road, Hull, HU9 5QJ (1 component)

New build one-hour duration storage to replace diesel plant

Active • 2025-26 (T-4)
Faraday Road, Plymouth, PL4 0ST (14 components)
• Gas fired reciprocating engines.
• Reciprocating Engines
Active • 2016-17 (TR), 2017-18 (T-1) ...
Duncombe Road, Girlington, Bradford, BD8 9AL (1 component)

New build one-hour duration storage to replace diesel plant

Active • 2026-27 (T-4)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (5 components)
• New build one-hour duration storage to replace diesel plant
• One-hour duration Battery Storage Plant.
Active • 2023-24 (T-1), 2024-25 (T-1)
Loading map...
Showing 13 locations