Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

5507 unique locations (42598 components) - Page 1 of 221

Active MW: 0.00 MW
Inactive MW: 0.00 MW
ZE1 (1 component)

Domestic demand turn down

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU ZE1
Active • 2025-26 (T-1)
YOULDEN CLOSE CAMBERLEY SURREY GU15 (1 component) Geocoding Needed

EV charging at residential premises

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU Rejected
Active • 2024-25 (T-1)
YORK ROAD NORTH DUFFIELD SELBY YO8 (2 components)

EV charging at residential premises (2)

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU Rejected
Active • 2024-25 (T-1), 2023-24 (T-1)
York Road Cliffe Selby YO8 (2 components)

EV charging at residential premises (2)

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU Rejected
Active • 2024-25 (T-1), 2023-24 (T-1)
YO8 (34 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO7 (16 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4)
YO62 (6 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
YO61 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO60 (4 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4)
YO51 (9 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO43 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4)
YO42 (18 components)
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4)
YO41 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO32 (22 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO31 (9 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO30 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO26 (31 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO25 (24 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO24 (16 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO23 (13 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO22 (1 component)

Domestic demand turn down

DSR OCTOPUS ENERGY LIMITED Unproven DSR CMU YO22
Active • 2025-26 (T-1)
YO21 (7 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
YO19 (22 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-1) ...
YO18 (6 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1)
YO17 (8 components)
• Domestic demand turn down (2)
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-1)
Loading map...
Showing 25 locations