Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OCTOPUS ENERGY LIMITED

68 unique locations (3396 components) - Page 1 of 3

Active MW: 1408.48 MW
Inactive MW: 447.19 MW
YO61 (31 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WS3 (35 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
' WHISTLEY HALL LOVE LANE ASHBURTON NEWTON ABBOTT DEVON TQ13 (1 component)

EV charging at residential premises

Active • 2027-28 (T-4)
WA9 (22 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WA6 (35 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
WA12 (36 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
TA1 (47 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SW13 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
ST8 (17 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
ST5 (53 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SS14 (15 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SO22 (48 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SN6 (39 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SN14 (53 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SL6 (104 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SK8 (65 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
SA11 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
S8 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
S13 (16 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
S11 (42 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RM18 (15 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG41 (82 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
RG22 (55 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
PO8 (60 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.04 MW
PE28 (140 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-1), 2024-25 (T-4) ...
0.24 MW
Loading map...
Showing 25 locations