MERCIA POWER RESPONSE LIMITED

6 unique locations (27 components)

Active MW: 414.49 MW
Inactive MW: 557.58 MW
Asher Lane, Ripley, Derbyshire, DE5 3RE (5 components)
• New reciprocating genset in acoustic enclosure
• New reciprocating engine in acoustic enclosure. *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Graphite Way, Hadfield, Glossop, Derbyshire, SK13 1QH *Post code and grid reference may not match because site address is not yet registered with post office. We have used nearest available post code. (4 components)
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• New reciprocating genset in acoustic enclosure
Active • 2028-29 (T-4), 2018-19 (T-1)
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (10 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 6 locations