Limejump Virtual 3 Limited

4 unique locations (22 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (6 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• Multiple components
Inactive • 2021-22 (T-4), 2021-22 (T-1) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (8 components)
• 1.200MW Battery Energy Storage System
• A Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Loading map...
Showing 4 locations