Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Limejump Virtual 1 Limited

10 unique locations (40 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Asda Farnborough, Portsmouth Rd, Frimley, Surrey GU16 7UJ (7 components)
• 24.95 MW of Battery Storage located at Waterlooville.
• Load curtailment on site and standby generation
• Load curtailment via standby generation exporting excess
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component)

19.6 MW Battery Storage facility located at Rock Farm, Shropshire.

Inactive • 2021-22 (T-4)
Land at Manor Farm Wainfleet Road Irby in the Marsh Skegness Lincolnshire PE24 5AY (1 component)

9.408 MW of Battery Storage at Land at Manor Farm, Lincolnshire.

Inactive • 2021-22 (T-4)
Land North of Bumpers Farm, Bumpers Lane, Ilmer HP27 9RE (1 component)

5 MW of Battery Storage located at Ilmer.

Inactive • 2021-22 (T-4)
Land North of Harriots Hayes Lane Albrighton Shropshire WV8 1RQ (1 component)

4.704 MW of Battery Storage located at Shropshire.

Inactive • 2021-22 (T-4)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (12 components)
• 7 MW of Battery Storage located at Grantham.
• A 7.5MW Battery Energy Storage System
• Battery Storage located at Grantham.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
Needless Hall Farm Toronto Bishop Auckland DL14 7RJ (1 component)

21.6 MW of Battery Storage located in Bishop Auckland.

Inactive • 2021-22 (T-4)
Partridge Hill Farm Austerfield Doncaster DN10 6HA (1 component)

10 MW of Battery Storage located at Doncaster.

Inactive • 2021-22 (T-4)
Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP (14 components)
• 20.000MW of battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP
• 20MW battery storage site
• Battery storage located at Sunrise House, Hulley Road, Macclesfield, Cheshire, SK10 2LP with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Loading map...
Showing 10 locations