Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

14 unique locations (41 components)

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (4 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Gaywood Farm Hilders Lane Edenbridge TN8 6LD (2 components)

7.5MW Lithium Ion Battery Technology

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (2 components)

A 0.18 MW Storage facility located in Norwich

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (4 components)

20 MW storage battery

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Philip Dennis Foodservice Mullacott Cross Industrial Estate Ilfracombe Devon EX34 8PL (2 components)

0.261MW Storage Battery located in Devon

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (2 components)

3.75 MW storage battery located in Devon

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (2 components)

1.5MW battery located in Southampton

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Salford Lodge Pitchill Evesham WR11 8SN (2 components)

0.1MW Tesla battery located at Eversham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Seamer Carr Landfill Seamer Scarborough YO12 4QA (2 components)

3MW Battery Storage facility located at Scarborough

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Stone Pit 1, Cotton Lane, Dartford, Kent DA9 9BB (7 components)
• N/A
• Storage equipment to be installed. The storage asset will be built in an existing building.
• The site will consist of a number of reciprocating machines - it is currently envisaged that these will be diesel.
Active • 2024-25 (T-4), 2021-22 (T-4) ...
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (4 components)

0.9MW Battery storage located at Hampshire

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (4 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Active • 2024-25 (T-4), 2021-22 (T-1) ...
Trent Basin Nottingham NG2 4DS (2 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Loading map...
Showing 14 locations