Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

14 unique locations (95 components)

Active MW: 393.19 MW
Inactive MW: 784.54 MW
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (14 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Inactive •
Gaywood Farm Hilders Lane Edenbridge TN8 6LD (6 components)

7.5MW Lithium Ion Battery Technology

Inactive •
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (5 components)

A 0.18 MW Storage facility located in Norwich

Inactive •
Land at KWTN Solar Limited at JB Wheaton and Sons Limited, Station Road, S Chard TA20 4QN (5 components)

1.14MW Battery Storage Facility

Battery Storage LIMEJUMP LTD Not Prequalified TA20
Inactive •
Land North of Clayhill Farm Westoning MK45 5JD (9 components)
• 6 MW Battery Storage facility located at Westoning.
• 6MW of demand reduction
Inactive •
Peel Common Battery Storage, Newgate Ln, Fareham, PO14 1JD (5 components)

20 MW storage battery

Inactive •
Philip Dennis Foodservice Roundswell Business Park Barnstaple Devon EX31 3TD (5 components)

3.75 MW storage battery located in Devon

Inactive •
Questmap Business park Drivers Wharf Northam Road Southampton SO14 0PF (5 components)

1.5MW battery located in Southampton

Inactive •
Salford Lodge Pitchill Evesham WR11 8SN (5 components)

0.1MW Tesla battery located at Eversham

Inactive •
Seamer Carr Landfill Seamer Scarborough YO12 4QA (5 components)

3MW Battery Storage facility located at Scarborough

Inactive •
The Quarry, Timsbury Manor, Manor Lane, Timsbury,Hampshire SO510NE (5 components)

0.9MW Battery storage located at Hampshire

Battery Storage LIMEJUMP LTD Not Prequalified
Inactive •
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (16 components)
• 1.200 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2 MW
Inactive •
Trent Basin Nottingham NG2 4DS (5 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive •
Loading map...
Showing 14 locations