Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

191 unique locations (963 components) - Page 8 of 8

Active MW: 96.34 MW
Inactive MW: 1081.39 MW
Thornham Lane, Emsworth, PO10 8DD (4 components)

18 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 18*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Trent Basin Nottingham NG2 4DS (4 components)

A 0.5MW Lithium Ion Battery based in Nottingham

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Twin Oaks Farm Land East of Yelt Farm Lower Street Doveridge DE6 5JW (4 components)

5 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (7 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (7 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.37 MW
Weeke Down, Lanham Lane, Winchester, SO22 5QL (3 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 35*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Weights Farm,Weights Lane,Redditch,B97 6RG (4 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Whitewall Cottages, Upnor Rd, Upnor, Rochester, ME2 4UZ (4 components)

50 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (6 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 16 locations