Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

290 unique locations (963 components) - Page 5 of 12

Active MW: 292.61 MW
Inactive MW: 885.12 MW
Gloucester Airport, Down Hatherley Lane, Gloucester, Gloucestershire GL2 9QH (5 components)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (2 components)

A 0.18 MW Storage facility located in Norwich

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gothic Cottage Farm Mill Rd East Ruston Norwich NR12 9HS (3 components)
• A 0.18 MW Storage facility located in Norwich
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Grain Rd, Rochester ME3 9RE (3 components)

35 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets

Inactive • 2017-18 (T-1)
"Grimsargh Preston Lancashire PR2 5LE " (2 components)

Turn down CMU

Inactive • 2017-18 (T-1)
Grimsargh Preston Lancashire PR2 5LE (3 components)

Turn down CMU

Inactive • 2017-18 (T-1)
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (2 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Ground Floor Rear of 91-93 Sterte Avenue West Poole Dorset BH15 2AL (3 components)
• 6MW of DSR
• On-site existing CHP generating unit
Inactive • 2021-22 (T-4), 2020-21 (T-1)
Grundon - Thorney Park Grundon - Starwork Grundon - Wingmoor Longma Cory - Highfield Cory - Shortwood Langage Farm Cory - Greatness Cory - Lyme&Wood Cory - Hafod Sovereign DC NEC (3 components)
• Generating unit 3. For Delivery Year 2017/18 only.
• Generating units participating in FFR
Inactive • 2017-18 (T-1), 2016-17 (TR)
Harewood Extension - Harewood Whin Landfill, Tinker Lane, Rufforth, York, YO23 3RR (4 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Harewood Extension - Harewood Whin Landfill, Tinker Lane, Rufforth, York, YO23 3RR
• Energy storage system providing capacity market, dynamic FFR and other balancing services.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Heywood Grange,Dilhorne,Staffordshire,ST10 2PL (5 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Heywood Grange,Dilhorne,Staffordshire,ST10 2PL

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Hill Village Nadder Lane South Molton Devon EX36 4HP (3 components)
• 0.15MW of demand reduction
• 10 MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Loading map...
Showing 25 locations