Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

197 unique locations (743 components) - Page 1 of 8

Active MW: 292.61 MW
Inactive MW: 885.12 MW
1 MW - Oakhill Farm, ST10 4JH (1 component)

1 MW diesel gensets

Inactive • 2020-21 (T-4)
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (5 components)

3 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)
• 0.27MW of demand reduction
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Askern CMM Generation Campsall Road Askern Doncaster DN6 0FD (1 component)

38 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets Disputes: 38*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4)
Auchencrosh Converter Station, Ballantrae, Girvan, KA26 OPE (5 components)
• 1.800 MW CHP generation
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) Public Limited Company, all part of the Mutual Energy Limited group of companies.
• The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. The link has a capacity of 500 MW. The Moyle Interconnector is owned and operated by Moyle Interconnector Limited, which is in turn financed through Moyle Holdings Limited and Moyle Interconnector (Financing) plc, all part of the Mutual Energy Limited group of companies.
Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (4 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Avely Landfill site, Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Barrasford Pumping Station Barrasford Hexham NE46 4AY (4 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (5 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Battery Plant, Fideoak Mill, Fideoak, Taunton, TA4 1AF (9 components)
• A New Build 14MW Gas Fuelled Generating Station.
• Battery Energy Storage System
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Bedhampton Quay, Harts Farm Way, Havant, PO9 1JN (5 components)

29 x 400kW cleaned thermal ( using Exhaust Gas Treatments) diesel gensets disputes: 29*400kW, 50Hz canopy type diesel generator sets ( MTU/Caterpillar that meet the EU?s Stage III A emissions …

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (5 components)
• 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
• a new build gas generating station
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Birds Eye Limited. Whapload Road, Lowestoft, Suffolk NR32 1XQ (8 components)
• 1 x 3.3 MW gas engine CHP plant
• 3.348 MW gas engine CHP plant
Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
Bourne Park Solar Farm, Bourne Park, Piddlehinton, Dorset. DT2 7TU (4 components)
• 800kW/ 1100kWh BYD Lithium Ion Battery
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (2 components)

9.8MW of turn down

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Brook Farm PV (DZS653A01) North Bradley Trowbridge Wiltshire BA14 9BT (3 components)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
• Demand reduction
Inactive • 2022-23 (T-3), 2018-19 (T-1)
Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT (6 components)
• 1 x 0.8MW / 1.1 MWh BYD Lithium Ion Battery: at Brook Hall Farm,North Bradley,Trowbridge,Wiltshire,BA14 9PT
• This DSR component is an industrial and commercial site which can reduce its imported electricity.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (6 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• Multiple components
Inactive • 2021-22 (T-4), 2021-22 (T-1) ...
Bulls Head Farm, Eakley Lanes, Newport Pagnell, MK16 8LP (4 components)

1 x 800kW/1100kWh Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 25 locations