Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

LIMEJUMP LTD

138 unique locations (433 components) - Page 1 of 6

Active MW: 292.61 MW
Inactive MW: 885.12 MW
10 Queens Drive , Kilmarnock, KA1 3XF (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (5 components)

3 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional SR8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (1 component)

4 MW of demand reduction

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (2 components)

4 MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (3 components)

0.27MW of demand reduction (2)

DSR LIMEJUMP LTD Conditional PE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Barrasford Pumping Station Barrasford Hexham NE46 4AY (3 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (6 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (2 components)

9.8MW of turn down

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Breach Farm Cadley Lane Caldwell Swadlincote Derbyshire DE12 6RJ (3 components)

9.8MW of turn down

Inactive • 2021-22 (T-4), 2018-19 (T-1)
BREACH FARM, CADLEY LANE, SWADLINCOTE, DERBYSHIRE, DE12 6RJ (5 components)

10 MW demand reduction

DSR LIMEJUMP LTD Conditional DE12
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (3 components)
• 1.2 MW of demand reduction
• 1.200MW Battery Energy Storage System
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 MW export capacity and an import capacity of 1.2MW
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Calgarth PS Old Hall Road Windermere LA23 1JA (1 component)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional TF2
Inactive • 2019-20 (T-1)
Calgarth PS Old Hall Road Windermere LA23 1JA (3 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional LA23
Inactive • 2022-23 (T-4), 2019-20 (T-1)
CALGARTH PS, WINDERMERE, CUMBRIA, LA23 (3 components)

0.2MW of demand reduction

DSR LIMEJUMP LTD Conditional LA2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
CHILTERN COLD STORAGE, CHILTERN HOUSE, SHREWSBURY AVENUE, PETERBOROUGH, CAMBRIDGESHIRE, PE2 7LB (3 components)

03MW of demand reduction

DSR LIMEJUMP LTD Conditional PE2
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Clowne Rd, Stanfree, Chesterfield, S44 6AG (8 components)
• 1 x 800kW/1100KWh Lithium Ion Battery
• 4MW of DSR
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Commerical Road, Wolverhampton, WV1 3RD (4 components)

5 MW of demand reduction

DSR LIMEJUMP LTD Conditional WV1
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Loading map...
Showing 25 locations