LAPWING FEN II LTD.

5 unique locations (81 components)

Active MW: 1.61 MW
Inactive MW: 16.10 MW
Asda Straiton, Bush Estate, Penicuik EH26 0QA. (3 components)
• Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.
• Load reduction via on-site standby generation taking site load
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (44 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Crown Farm, King John Bank, Walpole St. Andrew, Wisbech, Norfolk, PE13 5PR (16 components)
• Gas fuelled generation plant
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
RWE Generation UK plc, Hythe Power Station, Charleston Road Hardley Hythe Southampton SO45 3BP (1 component)

Battery storage installation to allow for the storage, importation and exportation of energy to the National Grid.

Inactive • 2021-22 (T-4)
Loading map...
Showing 5 locations