KEADBY GENERATION LIMITED

11 unique locations (401 components)

Active MW: 687.40 MW
Inactive MW: 12578.58 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (39 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Tir John N Rd, St Thomas, SA1 8NZ (10 components)

Reciprocating engines

Inactive • 2020-21 (T-4), 2017-18 (T-1) ...
Manvers 1 CMM Generation Off Golden Smithies Lane S63 7DN (5 components)

1x CAT G3520CPKG & MWM TBG 620V 16K

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (47 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land at Union Street, Masbrough, Rotherham, S61 1AA (11 components)

Reciprocating genset in acoustic enclosure

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (58 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (3 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT (11 components)

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
Loading map...
Showing 11 locations