Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

HANFORD WASTE SERVICES LIMITED

4 unique locations (22 components)

Active MW: 0.00 MW
Inactive MW: 29.91 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 6RB (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Auchencrosh Converter Station, Glenapp Estate, Ballantrae, Girvan, KA26 0NY (6 components)

The Moyle Interconnector links the electricity grids of Northern Ireland and Scotland through submarine cables running between converter stations at Ballycronan More in Islandmagee, County Antrim and Auchencrosh in Ayrshire. …

Active • 2027-28 (T-4), 2026-27 (T-4) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (3 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (8 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 4 locations