Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GSES 1 LIMITED

19 unique locations (55 components)

Active MW: 54.72 MW
Inactive MW: 128.11 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (2 components)

1.200MW of battery storage located at Durham.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Breach Farm Caldwell Swadlincote Derbyshire DE12 6RJ (1 component)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 9.8 MW export capacity and an import capacity of 10MW.

Inactive • 2020-21 (T-4)
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (6 components)

0.800MW of battery storage located at Wiltshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (2 components)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Cleveland Potash Ltd, Boulby Mine, Loftus, Saltburn TS13 4UZ (5 components)

Purpose Build Battery designed to be compliant in the FFR market.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (1 component)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2020-21 (T-1)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (4 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (2 components)

1.200MW of battery storage located at Preston.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (1 component)

1.200MW of battery storage located at Preston.

Inactive • 2020-21 (T-1)
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (2 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Hungerford Farm, Winchfield, Hook, RG27 8SW (1 component)

1.200MW of battery storage located at Hook.

Inactive • 2020-21 (T-1)
Land North of Clayhill, Westoning, MK45 5JD. (5 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (2 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
16.44 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (1 component)

20.000MW of battery storage located at Lascar Works

Inactive • 2020-21 (T-1)
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (1 component)

1.200MW of battery storage located at Durham.

Inactive • 2020-21 (T-1)
Lower Road, Brentwood, CM13 1BZ (2 components)
• Advanced battery energy storage system
• New Build Generation CMU, advanced battery energy storage system
Inactive • 2021-22 (T-4), 2019-20 (T-1)
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (2 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (6 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.86 MW
Loading map...
Showing 19 locations