Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

GSES 1 LIMITED

23 unique locations (153 components)

Active MW: 54.72 MW
Inactive MW: 128.11 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (3 components)

1.200MW of battery storage located at Durham.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (7 components)
• Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• New Build Battery Energy Storage Systems
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
Active • 2028-29 (T-4), 2024-25 (T-1) ...
Brook Hall Farm, North Bradley, Trowbridge, Wiltshire, BA14 9PT. (6 components)

0.800MW of battery storage located at Wiltshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.65 MW
Carlton, Stockton-on-Tees, TS21 1EA (7 components)
• 1.200MW of battery storage located at Stockton-on-Tees.
• Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.65 MW
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon CV37 9RG (3 components)

0.400MW of battery storage located at Stratford-Upon-Avon.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (1 component)

1.200MW of battery storage located at Stockton-on-Tees.

Inactive • 2023-24 (T-4)
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (3 components)

1.200MW of battery storage located at Preston.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (3 components)

1.000MW of battery storage located at Staffordshire.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (20 components)
• A new build 7.5MW gas fuelled generating station.
• A new build, gas fuelled generation station.
• Battery Storage Plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Hungerford Farm, Winchfield, Hook, RG27 8SW (3 components)

1.200MW of battery storage located at Hook.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land North of Clayhill, Westoning, MK45 5JD. (4 components)

1.200MW of battery storage located at Westoning.

Inactive • 2023-24 (T-4), 2020-21 (T-1)
Larport Farm Larport Lane Dormington Hereford HR1 4EP (4 components)

19.500 MW of battery storage located at Hereford.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Larport Farm Larport Lane Dormington Hereford HR1 4EP (9 components)
• 19.500 MW of battery storage located at Hereford.
• Nantwich Existing Site CHP
• Onsite load reduction and back up generation behind the meter on multiple sites
Active • 2027-28 (T-4), 2023-24 (T-4) ...
16.44 MW
Lascar Works, Tanpits Road, Bury, BL9 5BY (2 components)

20.000MW of battery storage located at Lascar Works

Inactive • 2023-24 (T-4), 2020-21 (T-1)
Lascar Works, Tanpits Road, Bury, BL9 5BY (15 components)
• 20.000MW of battery storage located at Lascar Works
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• Battery storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY with a nameplate capacity of 20.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (3 components)

1.200MW of battery storage located at Durham.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Neachley Ln, Shifnal TF11 8PQ (15 components)
• Gas peaking reciprocating engine
• Load reduction on site supported by non-exporting standby generation.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
New River Head TWRM Shaft & WBS, Amwell Street, Finsbury, London, United Kingdom, EC1R 1XU (4 components)
• 20.000MW of storage located at Lascar Works, Tanpits Road, Bury, BL9 5BY
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (3 components)

20.000 MW of battery storage located at Macclesfield.

Inactive • 2023-24 (T-4), 2020-21 (T-1) ...
Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP (6 components)
• 20.000 MW of battery storage located at Macclesfield.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
16.86 MW
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)

1.200MW of battery storage located at Preston.

Inactive • 2023-24 (T-4)
Loading map...
Showing 23 locations