FPC INDUSTRY & ENTERPRISE 2 LIMITED

14 unique locations (262 components)

Active MW: 196.66 MW
Inactive MW: 444.57 MW
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (27 components)
• A gas fuelled generating station.
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CCGT Baglan Unit 1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Brakes - Warrington, 3 Lockheed Road, Burtonwood, Warrington, WA5 4AH (22 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Broadgate, Chadderton, Oldham, Greater Manchester, OL9 9XA. (5 components)
• Energy facility comprising of reciprocating engine sets.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Inactive • 2022-23 (T-3), 2020-21 (T-4) ...
Cargill PLC, Trafford Park, Manchester, M17 1PA (69 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (37 components)
• 2mW 2.3MWH Battery Energy Storage System
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Land at Bricklayers Arms, Woburn Road, Bedford MK43 9AB (3 components)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4)
Land at Hermitage Park, Harts Farm Way, Havant, PO9 1HS (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2022-23 (T-4)
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (17 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
• 5 x 2MW Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear at Stanhope industrial Estate
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-4) ...
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY (8 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• Nantwich Existing Site CHP
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land off Bowbridge Lane, Balderton, Newark NG24 3BY (8 components)
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Plot A Land at Severn Road Avonmouth BS10 7SE (4 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• Unproven DSR Component
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (3 components)
• 2.6MW of demand reduction
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2024-25 (T-1), 2023-24 (T-4)
XPO Lowestoft Mobbs Way, Lowestoft NR32 3BN, United Kingdom (22 components)
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 14 locations