FLEXITRICITY LIMITED

111 unique locations (301 components) - Page 1 of 5

Active MW: 0.00 MW
Inactive MW: 0.00 MW
Wytch Farm, Wareham BH20 5JR (4 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each. (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (4 components)

3 x 1.6MW POSGU (standby generation) (3)

DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX62 FLEX62 TN14
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Windmill Hill Business Park, Swindon, SN5 6QR (4 components)
• Load reduction via standby generation taking onsite load (2)
• Load curtailment and standby generation
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +1 more SN5
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 ME9
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (2 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Reciprocating engines OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX52 FLEX52 Conditional LS10
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements. (2)
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Not Prequalified PR7
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 MK17
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
UNIT R2 ASHFORD AIRPORT, COLD STORE, LYMPNE, HYTHE, KENT, CT21 4LR (1 component)

Load drop at large Industrial cold storage

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX97 CT21
Inactive • 2020-21 (T-4)
Unit 5 Brown Lane West, Leeds. LS12 6BF (2 components)

Load reduction on site supported by non-exporting standby generation. (2)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 LS12
Inactive • 2022-23 (T-4), 2020-21 (T-4)
Unit 2 Welland Business Park, Clay Lake, Spalding PE12 6BL (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 PE12
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Unit 2 Northside, Freightliner Road, Brighton Road Industrial Estate, Hull HU3 4UW (1 component)

10 x 2MW new recip gas engines in a peaking plant environment, with a planned 15+ year lifespan. The installation and O&M put in place will meet the extended years …

Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional HU3
Inactive • 2022-23 (T-4)
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 ME19
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Timsbury Manor, Romsey SO51 0NE (1 component)

Lithium ion battery operating as a power plant. Change of use from redundant quarry.

Inactive • 2022-23 (T-4)
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (3 components)

Load reduction on site supported by non-exporting standby generation. (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU Cranstackie FLEX78 CT1
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Sutton & East Surrey Water, Shearwater Road, Off Garder Green Lane, Cheam, Surrey SM1 2BY (2 components)

2 x POSGU , each 0.8MW (2)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX61 SM1
Inactive • 2020-21 (T-4), 2017-18 (T-1)
SUPPLY TO R1, UNIT R1-R8, LYMPNE INDUSTRIAL ESTATE, LYMPNE, HYTHE, CT21 4LR (1 component)

Load drop at large Industrial cold storage

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX97 CT21
Inactive • 2020-21 (T-4)
Stretfield, Derbyshire, S33 9JT (2 components)

Load reduction on site supported by non-exporting standby generation. (2)

DSR FLEXITRICITY LIMITED Unproven DSR CMU FLEX73 FLEX73 S33
Inactive • 2021-22 (T-4), 2017-18 (T-1)
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (2 components)

2 POSGU (1.0MW and 0.6MW) (2)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX64 FLEX64 OX11
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Seafield Road, Edinburgh EH6 7LQ (7 components)

Standby generation, submetered, taking site load (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX63 FLEX63 +2 more EH6
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Saddlebow Road, Saddlebow, King's Lynn, Norfolk, PE34 3AG (1 component)

The construction of an peaking plant energy centre, which will house 15 gas engines and may be enhanced in future by battery storage.

OCGT and Reciprocating Engines FLEXITRICITY LIMITED New Build Generating CMU FLEX53 Rejected PE34
Inactive • 2021-22 (T-4)
Royal Mail Medway, Knight Road, Strood, Rochester, Kent ME2 2JE (2 components)

Standby generation (2)

FLEXITRICITY LIMITED Unproven DSR CMU FLEX75 ME2
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Riverside House, Main Street, Rotherham S60 1AE (4 components)

Load reduction and generation via standby assets (3)

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX71 FLEX71 +1 more S60
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
R&H Holt, Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (2 components)

One CHP of 1.0MW. Primary fuel type = Natural Gas (2)

Reciprocating Engines FLEXITRICITY LIMITED Existing Generating CMU FLEX22 WR11
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Pudding Lane Spalding, Lincs, PE11 3TJ (5 components)
• Load curtailment via standby generation (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +2 more PE11
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Portsmouth Rd, Frimley, Surrey GU16 7UJ (5 components)
• Standby generation sub-metered taking site load (2)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
DSR Reciprocating Engines FLEXITRICITY LIMITED Proven DSR CMU FLEX75 FLEX75 +2 more GU16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations