Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ENEL X UK LIMITED

480 unique locations (3708 components) - Page 1 of 20

Active MW: 3374.69 MW
Inactive MW: 6803.92 MW
17 SHANNON WAY, ASHCHURCH, TEWKESBURY, GL20 8ND (4 components)

The CMU ComponeThe CMU Component reduces import demand by turning off equipment and other non-essential loads.nt reduces import demand by turning off equipment and other non-essential loads.

Inactive •
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PG (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
14.00 MW
9 Roding Rd, London E6 6LF (2 components)

The CMU Component reduces demand

Inactive •
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
0.61 MW
ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
5.31 MW
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (12 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
5.31 MW
ADM Milling, Leith, Edinburgh EH6 6PQ (4 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
ADM Seaforth, Seaforth Dock, Liverpool, Merseyside, L21 4PG (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
5.31 MW
Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
2.61 MW
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
9.48 MW
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Ambleside Market Cross - Lakes LA22 9BT (1 component)

Commercial sites

Inactive •
8.95 MW
Amersham Sycamore Rd - East Berkshire HP6 5DR (1 component)

Commercial sites

Inactive •
8.95 MW
ANGLIAN WATER, GRAFHAM DAM PUMPING STATION, PERRY ROAD, BUCKDEN, HUNTINGDON, PE19 5XH (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
14.00 MW
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
Ardagh Glass, Headlands Lane, Knottingley WF11 0HP (26 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive •
Ardagh Glass, Portland Place, Irvine KA12 8JA (22 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive •
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO1 2TT (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
8.08 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive •
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
ASHBURY SITE, BESSEMER STREET, MANCHESTER, LANCASHIRE, M11 2NH. (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive •
9.48 MW
Loading map...
Showing 25 locations