Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

East Anglia Grid Storage One Limited

12 unique locations (88 components)

Active MW: 527.12 MW
Inactive MW: 492.71 MW
Site North of Hightown Drove Burwell Cambridgeshire, CB25 0FU (6 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Burwell MPAN ID: 1050002283664 CMU is a photovoltaic system connected to the transmission system.
• CMU is a photovoltaic system
Active • 2026-27 (T-4), 2025-26 (T-1) ...
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
• 49.900MW storage installation
• The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity is nominal and allows for site-specific variations.
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Runcorn site HQ, South Parade, PO Box 9, Runcorn, WA7 4JE (12 components)
• 10MW of onshore wind generation
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Chemical manufacturer
Active • 2024-25 (T-4), 2023-24 (T-4) ...
NORTH STREET BURWELL CAMBRIDGE CAMBRIDGESHIRE CB25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.67 MW
LOW ROAD BURWELL CAMBRIDGE CAMBRIDGESHIRE CB25 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.67 MW
Land to the East of Weirs Drove, Burwell, Cambridge, CB25 0BP, UK (1 component)

The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.

Inactive • 2021-22 (T-4)
Land at Weirs Drove, Cambridge, CB25 0BP (8 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
Goosehall Farm, Factory Road, Burwell, CB25 0BN (4 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system …

Active • 2025-26 (T-4), 2022-23 (T-1)
CORNFIELDS BURWELL CAMBRIDGE CB25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.67 MW
CEDAR GARDENS BURWELL CAMBRIDGE CB25 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
14.67 MW
BURWELL HILL BRACKLEY NORTHAMPTONSHIRE NN13 (3 components)

EV charging at residential premises

Inactive • 2023-24 (T-1)
14.67 MW
60-70 Reach Road Burwell CB25 0AH (3 components)
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
Loading map...
Showing 12 locations