Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

E.ON UK PLC

7 unique locations (150 components)

Active MW: 814.87 MW
Inactive MW: 2809.36 MW
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (21 components)

Paper products manufacturing site carrying out DSR by load turn-down

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.59 MW
SMACC Melting Shop, Shepcote Lane, Europa Link, Sheffield, S9 1TZ (21 components)
• Component is a steel melting facility with electric arc-furnaces, which can be controlled to reduce their power demand when required
• DSR Component providing load turndown at a steel melting facility with electric arc furnaces
• DSR component providing load turn-down at a steel melting facility with electric arc-furnaces
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.29 MW
Northfleet Mill, Crete Hall Road, Gravesend, DA11 9AD (20 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
4.00 MW
Flint Mill, Aber Road, Flint, CH6 5EX (18 components)
• DSR Component providing load turn down at a paper product manufacturing site
• DSR component providing load turn-down at a paper product manufacturing site
Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.33 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (32 components)

A gas engine CHP site providing electricity & heat to the associated development

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Barrow Mill, Park Road, Barrow in Furness, Cumbria, LA14 4TR (20 components)

Paper Mill carrying out DSR using load turn-down.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.00 MW
Loading map...
Showing 7 locations