Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CORSHELLACH ENERGY STORAGE LIMITED

3 unique locations (110 components)

Active MW: 0.00 MW
Inactive MW: 7.41 MW
AMERSTON CLOSE WYNYARD BILLINGHAM TS22 (2 components)
• Auxilary load included Net capacity quoted Location Daisymere Lane Buxton Derbyshire SK17 7JW UK
• Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.
Active • 2028-29 (T-4), 2018-19 (T-4)
7.41 MW
BS20 (106 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
Land adjacent to Berryburn Substation Moray (2 components)

Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.

Active • 2028-29 (T-4)
Loading map...
Showing 3 locations