Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

4 unique locations (1710 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
n/a (618 components) Geocoding Needed

n/a

DSR SSE ENERGY SUPPLY LIMITED Unproven DSR CMU SSE DSR Unit 2 SSE DSR Unit 3 +3 more
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
N/A (457 components) Geocoding Needed
β€’ DSR components shall be assigned prior to the start of the Delivery Year.
β€’ We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
β€’ bus depot site
DSR EDF ENERGY CUSTOMERS LIMITED E.ON UK PLC ZENOBE RENTAL 12 LIMITED +8 more Unproven DSR CMU CMU_GE_DSR1 DSRUNP(MIX) +286 more
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
NA (618 components) Geocoding Needed
β€’ Batteries behind the meter at industrial/commercial sites
β€’ Battery situated behind-the-meter with demand at a commercial site
β€’ Behind the meter battery at industrial/commercial site
DSR FLEXITRICITY LIMITED Unproven DSR CMU F20114 F20119 +60 more
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, PE34 3AL (17 components)

The DSR is created by load management of the on site, twin stream, paper De-Inking Plant. Metering arrangements will measure the net reduction resulting from an instruction to reduce the …

DSR Combined Heat and Power (CHP) Palm Paper Limited Unproven DSR CMU Palm Paper DIP PE34
Active β€’ 2029-30 (T-4), 2028-29 (T-4) ...
Loading map...
Showing 4 locations