Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

35 unique locations (926 components) - Page 1 of 2

Active MW: 1658.75 MW
Inactive MW: 3375.49 MW
133 Balornock Road, Glasgow, G21 3UW (22 components)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
195 Aylesone Rd, Leicester LE2 7QJ (34 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (27 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (9 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (35 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2024-25 (T-4), 2023-24 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (14 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.35 MW
British Gas, New Bridge Ln, Stockport, SK1 2HQ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Budds Plantation Paices Hill Aldermaston RG7 4PJ (7 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (10 components)

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2023-24 (T-4) ...
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (36 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2023-24 (T-4) ...
Component has yet to be procured. (211 components)

Component has yet to be procured.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (23 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (75 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (13 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lawford Rd, Rugby CV21 2RY, United Kingdom (22 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Long Lane, Westhoughton, Bolton, Lancashire BL5 3QR (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (13 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
New Victoria Park, Grange Road, Glasgow, G42 9LF (20 components)

Generators at hospital site

Active • 2024-25 (T-1), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (22 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.92 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (11 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations