CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

13 unique locations (211 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)
• 1 x hydro turbine & synchronous generator
• Bus depot site
• MTU - 8V400064 1.013MW
Active • 2024-25 (T-1), 2023-24 (T-4) ...
Asda Gosforth Wansbeck Road, Wansbeck Road South Fawdon, Newcastle, NE3 3HQ (10 components)
• Gas Turbine Cogeneration Unit GT3
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (22 components)
• BtM storage providing standby capacity
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Fawley, Cadland Road, Hythe, SO45 3NX (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Margam, Longlands Lane, Port Talbot, SA13 2NS (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Middlesbrough, Teessdock Road, Grangetown, TS6 7RT (22 components)
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Scunthorpe, Warren Road, Scunthorpe, DN15 6XH (20 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (12 components)
• 1 * 1.7MW diesel reciporcating engine
• 1 * 1.7MW diesel reciprocating engine
• Peak power plant
Active • 2025-26 (T-4), 2023-24 (T-1) ...
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (15 components)
• 6 x reciprocating engines
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Distribution Centre with behind the meter back-up generation.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (10 components)
• 1.280MW CHP
• Aggregate CMU from Multiple Sources
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Waterswallows, Tunstead Quarry, Tunstead, Buxton, Derbyshire SK17 8TG (23 components)
• On-site existing CHP generating unit
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
Windsor Battery West, Millstream East, Maidenhead Road, Windsor, Berkshire, SL4 5GD. (9 components)
• Battery Storage
• Chemical manufacturer
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...