CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

7 unique locations (74 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Land at Model Farm, Frenchs Road, Walpole St. Andrew, Norfolk, PE14 7JE. (17 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 2026 kW CHP unit
• N/A
Active • 2025-26 (T-4), 2022-23 (T-4) ...
Marks & Spencer - Stockley Park, 3 Longwalk Road, Stockley Park, Uxbridge, UB11 1AW (10 components)
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Load reduction
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (8 components)
• On-site existing CHP generating unit
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network in WPD's West Midland region.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Westexe, Tiverton, Devon, EX16 5LL (8 components)
• 2026 kW CHP unit
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
WHITLEY GOLF COURSE CORSHAM ROAD, SHAW, MELKSHAM SN12 8EQ. (Nearest postcode to grid reference: SN12 8EH). (18 components)
• Battery Storage Plant
• Battery storage unit
• Steam Driven Turbo Alternator 8G1 6,8 MWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 7 locations