CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

82 unique locations (1768 components) - Page 1 of 4

Active MW: 95.96 MW
Inactive MW: 25.05 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components)

2026 kW CHP unit (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Unit 3016 Hereford Street Bolton BL1 8HU (6 components)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Unit 2898, Tuscany Park, Wakefield, WF6 2TZ (6 components)

EnerG 1000 CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Unit 2898 Tuscany Park Wakefield WF6 2TZ (6 components)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Thirsk Factory, Dalton Airfield, Topcliffe, Thirsk, YO7 3HE. (5 components)

1.280MW CHP (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Stanlow Manufacturing Complex, Ellesmere Port, Cheshire, CH65 4HB (3 components)
• 2 x On-site turbo alternators
• 6 x On-site turbo alternators
• Power Recovery Train
Inactive • 2019-20 (T-1)
Southdownview Way, Worthing, West Sussex, BN14 8QH (8 components)

CHP and autogeneration (3)

Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1D-WR GSK Irvine, Worthing +1 more BN14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Shewalton Road, Irvine, West Sussex, KA11 5AP (4 components)

CHP and autogeneration (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, PE34 3AL (17 components)

The DSR is created by load management of the on site, twin stream, paper De-Inking Plant. Metering arrangements will measure the net reduction resulting from an instruction to reduce the …

DSR Combined Heat and Power (CHP) Palm Paper Limited Unproven DSR CMU Palm Paper DIP PE34
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (11 components)

Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Priory Street, Ware, Hertfordshire, SG12 0DJ (9 components)

On-site existing CHP generating unit (3)

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1C-WA Glaxo Barnard Montrose Ware & Worthing +2 more SG12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (10 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to … (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Proven DSR CMU REST46 REST46 +2 more PE34
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (20 components)

On-site existing CHP generating unit (3)

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES2B-WRD Glaxo R&D Stevenage, Ware +2 more SG12
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (10 components)

On-site existing CHP generating unit (3)

CHP and autogeneration Combined Heat and Power (CHP) DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED Existing Generating CMU Glaxo Operations Ulverston Glaxo Operations Ulverston +1 more LA12
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (18 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (5 components)

Distribution Centre with behind the meter back up generation (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (6 components)

Distribution Centre with behind the meter back-up generation. (3)

DSR GB GAS HOLDINGS LIMITED Proven DSR CMU CENEST CENEST1 LE19
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations