CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

22 unique locations (546 components)

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
1 Rivington Rd, Preston Brook, Runcorn WA7 3DP, United Kingdom (13 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• On-site existing CHP generating unit
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Asda Gosforth Wansbeck Road, Wansbeck Road South Fawdon, Newcastle, NE3 3HQ (10 components)
• Gas Turbine Cogeneration Unit GT3
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (46 components)
• Hamms Hall - Existing Site CHP
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• existing CHP on site
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (15 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Drumderg Wind Farm, Dalruzion, Perth & Kinross, PH11 8LH (2 components)
• On-site existing CHP generating unit
• Wind farm consisting of 16 wind turbines
Active • 2028-29 (T-4), 2023-24 (T-4)
enfinium Kelvin Limited, Giffords Way (off Kelvin Way), West Bromwich, B70 7JR (3 components)
• 1.280MW CHP
• 4MW battery co-located with a solar farm
• Kelvin is an energy-from-waste facility which is currently under construction with scheduled commissioning in 2025. A connection offer has been accepted with Western Power Distribution.
Active • 2028-29 (T-4), 2021-22 (T-4)
Fowler Welch - Site 2, W Marsh Rd, Spalding PE11 2HR, UK (22 components)
• Gas turbine generator
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Fowler Welch - Site 3, W Marsh Rd, Spalding PE11 2HR, UK (23 components)
• A 10MW new build gas generating station..
• CMU consisting of multiple reciprocating engines and alternators
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
International Conference Centre, Birmingham, B1 2EA (13 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• CHP Unit
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2025-26 (T-1) ...
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP (13 components)
• 19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
• Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• EnerG 1000 CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (16 components)
• A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Nantwich Existing Site CHP
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (8 components)
• A gas engine CHP site providing hot water to a local district heating network
• Battery storage
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Power Station Road Isle of Grain Rochester ME3 0AR (69 components)
• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Rannoch Power Station, Rannoch, Perthshire, PH17 2QP (49 components)
• 1 x hydro turbine & synchronous generator
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
SIMEC Lochaber Power Lochaber Smelter North Road Fort William PH336TH (65 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 4 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (12 components)
• Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the combined peak of all the component units to determine the capacity of LDEC as a single CMU hence the connected capacity above being consistent with the three peaks of the combined units.
• Existing Energy from Waste Plant
• On-site existing CHP generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (20 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build windfarm.
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Weetabix, Station Rd, Burton Latimer, Kettering NN15 5JR, United Kingdom (27 components)
• Component has yet to be procured.
• EnerG 1000 CHP
• On-site CHP - existing generating unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (47 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
• A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
Loading map...
Showing 22 locations