CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

9 unique locations (114 components)

Active MW: 0.00 MW
Inactive MW: 0.00 MW
1 Waterfront Avenue, Edinburgh, EH5 1SG (12 components)
• Office site with behind the meter back up generation
• Office site with behind the meter generation
• Office site with behind the meter generation.
DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST CENEST +2 more EH5
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2600 John Smith Drive, Oxford, OX4 2JY (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST CENEST1 +8 more OX4
Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (19 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST CENEST1 +8 more G71
Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (8 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Unproven DSR CMU CENEST2 CENEST2 +4 more SK1
Active • 2026-27 (T-4), 2025-26 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU (5 components)
• Distribution Centre with behind the meter back up generation
• Distribution centre with behind the meter back up generation
DSR GB GAS HOLDINGS LIMITED Unproven DSR CMU CENEST LE19
Active • 2025-26 (T-4), 2024-25 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, Leicestershire, LE19 1SU. (5 components)

Distribution Centre with behind the meter back up generation (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (18 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT. (18 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (10 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to … (3)

DSR CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Proven DSR CMU REST46 REST46 +2 more PE34
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 9 locations