Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED

26 unique locations (588 components) - Page 1 of 2

Active MW: 881.00 MW
Inactive MW: 4153.24 MW
195 Aylesone Rd, Leicester LE2 7QJ (33 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (26 components)

Office site with behind the meter generation (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2600 John Smith Drive, Oxford, OX4 2JY (37 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (8 components)

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (36 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2GT (14 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.08 MW
British Gas, New Bridge Ln, Stockport, SK1 2HQ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (36 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (16 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (30 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (11 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (26 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (12 components)
• Battery Storage
• Battery storage
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
North Avenue, Marston Green, Birmingham, B40 1NT (20 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• ... and 1 more unique description
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.92 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (10 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (22 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Park Road, Ware. Hertfordshire, SG12 0DP (33 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (14 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.57 MW
Priory Street, Ware, Hertfordshire, SG12 0DJ (17 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (20 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 25 locations