CENTRICA BUSINESS SOLUTIONS (GENERATION) LIMITED

5 unique locations (42 components)

Active MW: 588.77 MW
Inactive MW: 4445.47 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (11 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (22 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Belliver Way, Roborough, Plymouth, PL6 7BP (4 components)

2025 KW gas fire engine

Active • 2028-29 (T-4), 2025-26 (T-1) ...