Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BRITISH GAS TRADING LIMITED

7 unique locations (98 components)

Active MW: 451.68 MW
Inactive MW: 546.18 MW
6 Braham St, Aldgate, London, E1 8EE (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Great Maze Pond, London, SE1 9RT (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Huntingdon, PE29 6WP (5 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (48 components)
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 2 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• Hydro power turbine generator Unit 3 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
• ... and 2 more unique descriptions
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Newton Rd, Crawley, RH10 9TT (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Vodafone House, Newbury, RG14 2FN (7 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Loading map...
Showing 7 locations