BESS Claredown Limited

2 unique locations (11 components)

Active MW: 207.73 MW
Inactive MW: 331.51 MW
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 component)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Inactive • 2022-23 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (10 components)
• 20 MW of DSR
• 20 MW of demand reduction
• 20MW Battery Storage Facility located in Sudbury, Essex.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 2 locations